Project Milestone

In February 2026, our company successfully fulfilled and delivered the export project of 4-inch steel cord reinforced composite pipes destined for Mumbai, India.

Execution & Field Operations

The entire lifecycle of the project—spanning from cargo delivery and on-site alignment to actual field laying and installation—was pushed forward in a highly organized and systematic manner. Currently, all on-site construction, jointing, and system commissioning operations have been successfully finalized.

Operational Status

At this stage, the pipeline system is operating with exceptional stability. All performance and operational metrics strictly meet the predetermined engineering design standards, and the entire network maintains an excellent overall operational record.